LOADING

Type to search

Foundation for Amravati iconic bridge

Andhra pradesh News

Foundation for Amravati iconic bridge

admin1 January 12, 2019
Share

AP Chief Minister Chandrababu Naidu laid the foundation stone for two key projects in the state of Navyandra Amravati. Constructing the Vijayawada-Hyderabad National Highway with the capital, Chandrababu laid the foundation stone of the iconic bridge at the Krishna River near the holy shrine near Ibrahimapatnam. Water pumping is also done for drinking water needs.The 3.2-km-long iconic bridge will be built at Krishnanadi at a cost of Rs.1387 crores from the holy sacraments to Amravati near Ibrahimpatnam. The center is constructed as an iconic 0.48 km. This pillon is similar to that of yoga pose. It is connected to the bridge and has a two-sided chair. This pile height is 170 meters. Constructed in six rows. The two sides have a 2.5 m wide walkway. The pile foundation is laid for construction. With this bridge, Hyderabad and Jagdalpur National Highways connect to Amravati. Traffic will also be reduced from Vijayawada to 40 km from both the places. Saves 2 hours of travel time.

Translate »